⚠ BETA v0.1 AI-generated lift plans are for preliminary planning purposes only. Always verify crane specifications, load calculations, and site conditions with a licensed engineer before any lift operation. CraneGenius is under active development - features and data updated regularly. Not professional engineering advice.
Overview AI Lift Planner Full Lift Matrix
Data Center Construction Intelligence

Know Every
Lift Before
Day One.

AI-powered equipment planning for data center builds. From civil groundwork to module placement - we map every crane, every weight, every vendor before you break ground.

$2.4T
DATA CENTER
CAPEX 2025 - 2030
47+
DISTINCT LIFT
TYPES PER BUILD
380T
MAX LOAD
TRANSFORMER SET
3 - 7
CRANE TYPES
PER MAJOR CAMPUS
Select Your Build Type
CraneGenius AI identifies all lift requirements, weight specs, and critical path crane needs based on your facility type.
Priority
HC
Hyperscale Campus
500k - 2M+ sq ft. Multiple buildings, central utility plant, large transformer banks. Think AWS, Microsoft, Google.
Growing
CE
Colo / Edge Facility
50k - 200k sq ft. Multi-tenant. High-density power. Urban infill or suburban campus.
New
MP
Modular / Prefab
Factory-built modules placed on site. Critical precision lifts. Rapid deployment timeline.
RX
Retrofit / Expansion
Existing facility expansion. Generator additions, cooling retrofits, PDU upgrades. Constrained access.
AI Focus
AI
AI Training Campus
GPU cluster facilities. Extreme power density. Specialized cooling. 100MW+ sites.
FD
Federal / Secured
DoD, government classified facilities. Stringent access control. Specialized compliance requirements.
Analyzing build type...
Scanning structural requirements...
Matching crane specifications...
// CraneGenius AI
CraneGenius AI: Analyzing Hyperscale Campus build. I've identified 7 construction phases with 23 distinct crane requirements. Heaviest lift: transformer banks at 280 - 380 tons. Expect crawler crane, 2 - 3 tower cranes, and specialized rigging.
CF Civil & FoundationMo. 1 - 4
SS Structural SteelMo. 3 - 8
EP Electrical & PowerMo. 6 - 14
MEP Cooling & MEPMo. 8 - 16
IT IT Fit-OutMo. 14 - 20
Civil & Foundation - Crane Requirements
7 Equipment Types
Crawler Crane - Heavy Lift
750 - 1,500 ton Liebherr LR 1750 / Manitowoc 21000
Pile cap installation, caisson work, pre-cast concrete panels.
Duration: 8 - 12 weeks Setup: 6080 ft minimum
Rough Terrain Crane
100 - 165 ton Grove RT9150E / Liebherr LTR 1100
Excavation shoring, formwork placement, rebar bundle picks.
Duration: Full civil phase High mobility required
Piling Rig / Drilling Crane
Bauer BG 28 or equiv. Driven or drilled piles per geotech
Critical if poor soil conditions. Typical 400 - 800 pile locations.
May need vibro hammer attachment
Telescopic Boom Truck
40 - 80 ton Manitex / Elliott
Utility work, light picks, material staging throughout site.
Quantity: 2 - 3 units recommended
280 - 380T
Transformer Banks
40 - 80T
Pre-Cast Panels
60 - 120T
Cooling Towers
20 - 45T
Generator Sets
8 - 15T
UPS Modules
Barnhart Crane
National Heavy Lift Specialist
★★ 4.9
ALL Crane Rental
Multi-Regional Full Fleet
★★ 4.7
BrandSafway
National Access + Crane
★★ 4.6
Get Your Full Lift Plan
Complete crane schedule, vendor bids, and financing options - delivered in 24 hours.
Build Your Lift Plan
Describe your data center project and our AI will generate a complete crane and equipment plan.
// CraneGenius AI - Lift Planner
Select a build type above and describe your project to generate a full lift plan with equipment specs, vendor matches, and cost estimates.
All 23 Crane Requirements
Every required and recommended lift across all construction phases for a Hyperscale Campus build.
Equipment Type Phase Capacity Duration Status
Crawler Crane - Heavy LiftCivil750 - 1500T8 - 12 wkRequired
Tower Crane - Luffing JibStructural12 - 18T tip6 - 10 moRequired
Tower Crane - Flat Top (2)Structural8 - 16T tip5 - 8 moRequired
All-Terrain - Transformer SetElectrical400 - 500T2 - 3 wkRequired
Rough Terrain - General WorksAll Phases100 - 165TFull buildRequired
Pick & Carry - Site MobilityAll Phases70 - 100TFull buildRecommended
Boom Truck - MEP Install (3)MEP / Fit-Out30 - 50T4 - 6 moRequired
Crawler - Cooling Tower SetCooling250 - 350T3 - 5 wkRequired
Knuckle Boom - Rooftop WorkMEP / Roof20 - 40T2 - 3 moOptional
Spider Crane - Indoor MEPIT Fit-Out1 - 3T4 - 8 wkRecommended
Mini Crawler - Tight AccessIT Fit-Out2 - 6T2 - 6 wkRecommended
Carry Deck - Internal LogisticsAll Phases15 - 30TFull buildRecommended
Want All 23 Equipment Types?
Full specs, pricing ranges, and vendor matches included in the complete lift plan.
// How We Work Together
Pick the arrangement that fits
No long-term contract required to start. Most clients begin with a pilot month and expand from there.
Flagship
$2,500
/month

Intelligence Subscription

We monitor your territory, score for data center construction demand, and deliver job-ready leads with GC contact info, crane window timing, and AI outreach copy. Shared market access.

Exclusive Territory
$5,000
/month

Market Lock + Done-With-You Ramp

90-day GTM ramp: we generate your first revenue and build your outbound playbook. Then you graduate to exclusive market coverage. Your metro is locked — no competitor can buy it while you hold it.

Community
$497
/month

Weekly Brief + Community

Weekly permit brief plus private community access. No personalized contacts or AI outreach copy.