⚠ BETA v0.1
AI-generated lift plans are for preliminary planning purposes only. Always verify crane specifications, load calculations, and site conditions with a licensed engineer before any lift operation. CraneGenius is under active development - features and data updated regularly. Not professional engineering advice.
DISMISS ✕
Data Center Construction Intelligence
Know Every Lift Before Day One.
AI-powered equipment planning for data center builds. From civil groundwork to module placement - we map every crane, every weight, every vendor before you break ground.
$2.4T
DATA CENTER CAPEX 2025 - 2030
47+
DISTINCT LIFT TYPES PER BUILD
380T
MAX LOAD TRANSFORMER SET
3 - 7
CRANE TYPES PER MAJOR CAMPUS
// Step 1 - Build Intelligence
Select Your Build Type
CraneGenius AI identifies all lift requirements, weight specs, and critical path crane needs based on your facility type.
Priority
HC
Hyperscale Campus
500k - 2M+ sq ft. Multiple buildings, central utility plant, large transformer banks. Think AWS, Microsoft, Google.
Growing
CE
Colo / Edge Facility
50k - 200k sq ft. Multi-tenant. High-density power. Urban infill or suburban campus.
New
MP
Modular / Prefab
Factory-built modules placed on site. Critical precision lifts. Rapid deployment timeline.
RX
Retrofit / Expansion
Existing facility expansion. Generator additions, cooling retrofits, PDU upgrades. Constrained access.
AI Focus
AI
AI Training Campus
GPU cluster facilities. Extreme power density. Specialized cooling. 100MW+ sites.
FD
Federal / Secured
DoD, government classified facilities. Stringent access control. Specialized compliance requirements.
Analyzing build type...
Scanning structural requirements...
Matching crane specifications...
// CraneGenius AI
CraneGenius AI: Analyzing Hyperscale Campus build. I've identified 7 construction phases with 23 distinct crane requirements . Heaviest lift: transformer banks at 280 - 380 tons . Expect crawler crane, 2 - 3 tower cranes, and specialized rigging.
Ask →
// Step 2 - Construction Phases
CF Civil & FoundationMo. 1 - 4
SS Structural SteelMo. 3 - 8
EP Electrical & PowerMo. 6 - 14
MEP Cooling & MEPMo. 8 - 16
IT IT Fit-OutMo. 14 - 20
Crawler Crane - Heavy Lift
750 - 1,500 ton Liebherr LR 1750 / Manitowoc 21000
Pile cap installation, caisson work, pre-cast concrete panels.
Duration: 8 - 12 weeks Setup: 6080 ft minimum
Quote
Rough Terrain Crane
100 - 165 ton Grove RT9150E / Liebherr LTR 1100
Excavation shoring, formwork placement, rebar bundle picks.
Duration: Full civil phase High mobility required
Quote
Piling Rig / Drilling Crane
Bauer BG 28 or equiv. Driven or drilled piles per geotech
Critical if poor soil conditions. Typical 400 - 800 pile locations.
May need vibro hammer attachment
Quote
Telescopic Boom Truck
40 - 80 ton Manitex / Elliott
Utility work, light picks, material staging throughout site.
Quantity: 2 - 3 units recommended
Quote
// Critical Weight Specs
280 - 380T
Transformer Banks
// Matched Vendors Near You
Barnhart Crane
National Heavy Lift Specialist
★★ 4.9
ALL Crane Rental
Multi-Regional Full Fleet
★★ 4.7
BrandSafway
National Access + Crane
★★ 4.6
Get Your Full Lift Plan
Complete crane schedule, vendor bids, and financing options - delivered in 24 hours.
// AI Lift Planner
Build Your Lift Plan
Describe your data center project and our AI will generate a complete crane and equipment plan.
// CraneGenius AI - Lift Planner
Select a build type above and describe your project to generate a full lift plan with equipment specs, vendor matches, and cost estimates.
Generate Plan →
Add to Plan
Your Crane Plan
Request CAA Quote
// Full Equipment Matrix
All 23 Crane Requirements
Every required and recommended lift across all construction phases for a Hyperscale Campus build.
Equipment Type
Phase
Capacity
Duration
Status
Crawler Crane - Heavy Lift Civil 750 - 1500T 8 - 12 wk Required
Tower Crane - Luffing Jib Structural 12 - 18T tip 6 - 10 mo Required
Tower Crane - Flat Top (2) Structural 8 - 16T tip 5 - 8 mo Required
All-Terrain - Transformer Set Electrical 400 - 500T 2 - 3 wk Required
Rough Terrain - General Works All Phases 100 - 165T Full build Required
Pick & Carry - Site Mobility All Phases 70 - 100T Full build Recommended
Boom Truck - MEP Install (3) MEP / Fit-Out 30 - 50T 4 - 6 mo Required
Crawler - Cooling Tower Set Cooling 250 - 350T 3 - 5 wk Required
Knuckle Boom - Rooftop Work MEP / Roof 20 - 40T 2 - 3 mo Optional
Spider Crane - Indoor MEP IT Fit-Out 1 - 3T 4 - 8 wk Recommended
Mini Crawler - Tight Access IT Fit-Out 2 - 6T 2 - 6 wk Recommended
Carry Deck - Internal Logistics All Phases 15 - 30T Full build Recommended
Want All 23 Equipment Types?
Full specs, pricing ranges, and vendor matches included in the complete lift plan.
// How We Work Together
Pick the arrangement that fits
No long-term contract required to start. Most clients begin with a pilot month and expand from there.
Flagship
$2,500
/month
Intelligence Subscription
We monitor your territory, score for data center construction demand, and deliver job-ready leads with GC contact info, crane window timing, and AI outreach copy. Shared market access.
Exclusive Territory
$5,000
/month
Market Lock + Done-With-You Ramp
90-day GTM ramp: we generate your first revenue and build your outbound playbook. Then you graduate to exclusive market coverage. Your metro is locked — no competitor can buy it while you hold it.
Community
$497
/month
Weekly Brief + Community
Weekly permit brief plus private community access. No personalized contacts or AI outreach copy.